1、嘷攀瀀栀琀洀氀狅筴搁/Ie前台访问/p-53715.html46.229.168.1320r翴淐挀瀀栀琀洀氀狅箁搁/Ia前台访问/p-23970.html207.46.13.530r遜疰挀瀀栀琀洀氀狅箒搁黭/Ia前台访问/p-31841.html54.36.150.270r鏠攀瀀栀琀洀氀狅箙搁徍/Kc前台访问/p-331952.html54.36.149.520r髨攀瀀栀琀洀氀狅管搁/前台访问/c-0002100006-3-134-0-0-0-0-9-7-1.html207.46.13.530r挀瀀栀琀洀氀狅箵搁/Ie前台访问/p-10495.html46.229.168.1310r挀瀀栀琀洀
2、氀狅篐搁/Ke前台访问/p-100555.html207.46.13.1190r跐鷪愀瀀栀琀洀氀狅袷篜搁餭/Ie前台访问/p-62309.html42.156.138.1230r跐最瀀栀琀洀氀伀狅篞搁/Ic前台访问/p-62302.html42.156.138.330r最搀栀琀洀氀儀狅篠搁响/Ie前台访问/p-84500.html42.120.161.1120r最瀀栀琀洀氀匀狅怀摋篢搁鐀/Ic前台访问/p-70483.html106.11.156.420r攀瀀栀琀洀氀唀狅退篣搁/Ke前台访问/d-339225.html42.156.137.660r愀瀀栀琀洀氀圀狅篥搁/Ke前台访问/d-378
3、667.html42.156.139.290r淐縿愀瀀栀琀洀氀夀狅篳搁/Ie前台访问/p-39133.html46.229.168.1390r耍挀瀀栀琀洀氀嬀狅篼搁/Kc前台访问/p-153942.html207.46.13.530r淐秹愀瀀栀琀洀氀崀狅钷簌搁蚭/Kg前台访问/p-131011.html46.229.168.1490r跐攀瀀栀琀洀氀开狅鲷簓搁/Ki前台访问/p-344426.html220.181.108.1550r時猀攀愀爀挀栀栀琀洀氀瀀愀最攀愀洀瀀琀挀愀洀瀀栀漀琀攀礀眀漀爀搀愀洀瀀搀愀洀瀀瀀愀洀瀀昀椀氀攀吀礀瀀攀愀洀瀀琀愀洀瀀甀愀狅簩搁/Kc前台访问/p-315730.ht
4、ml207.46.13.530r最瀀栀琀洀氀挀狅簽搁/Ki前台访问/p-363164.html220.181.108.1460r冸霶最瀀栀琀洀氀攀狅籘搁/Ie前台访问/p-69383.html46.229.168.1370r椨挀瀀栀琀洀氀最狅籩搁/Ke前台访问/p-371098.html123.125.71.570r瓠攀搀栀琀洀氀椀狅籺搁/Ic前台访问/p-96735.html207.46.13.1190r篨攀瀀栀琀洀氀欀狅籽搁/Ia前台访问/p-42377.html54.36.150.450r繀愀氀漀最椀渀愀猀瀀砀洀狅舀颷粀搁1WsloginUserName:AntonioNip175.13
5、9.165.990r苰韯挀瀀栀琀洀氀漀狅粏搁/Ie前台访问/p-26254.html46.229.168.1410r鈬淐挀瀀栀琀洀氀焀狅舀墷粓搁/Kg前台访问/p-346371.html216.244.66.2000r醂开瀀栀琀洀氀猀狅粰搁湭/Ki前台访问/p-163913.html220.181.125.1860r跐挀瀀栀琀洀氀甀狅怀屽粼搁/Ig前台访问/d-98588.html220.181.125.1860r愀瀀栀琀洀氀眀狅糂搁/Ie前台访问/p-20423.html46.229.168.1330r挀瀀栀琀洀氀礀狅糪搁/Ic前台访问/p-16133.html207.46.13.1190r
6、最瀀栀琀洀氀笀狅糮搁/Kg前台访问/p-198059.html46.229.168.1460r鐁椀瀀栀琀洀氀紀狅系搁梍/Ke前台访问/p-164446.html207.46.13.1190r跐椀瀀栀琀洀氀缀狅紃搁鬭/Kc前台访问/p-152156.html207.46.13.530r攀瀀栀琀洀氀脀狅紅搁/Kg前台访问/p-319805.html203.208.60.1250r跐攀瀀栀琀洀氀茀狅撷紎搁/Ki前台访问/p-110935.html220.181.125.1860r愀瀀栀琀洀氀蔀狅氀紕搁/Ke前台访问/d-108301.html112.97.55.1190r最瀀栀琀洀氀蜀狅簀紣搁/e前
7、台访问/search.html?p=0&q=JAVA203.208.60.00r跐贽椀瀀栀琀洀氀褀狅累搁/Ke前台访问/p-143107.html42.120.161.16跐攀瀀栀琀洀氀謀狅怀怒細搁/Kg前台访问/p-350151.html42.156.254.1200r最瀀栀琀洀氀贀狅紲搁瘭/Kg前台访问/p-143128.html42.156.139.1120r椄攀搀栀琀洀氀輀狅紵搁/Kc前台访问/p-336947.html54.36.148.710r淐挀瀀栀琀洀氀鄀狅紶搁龍/Ke前台访问/p-339717.html54.36.150.1510r挀瀀栀琀洀氀錀狅紼搁挍/Kg前台访问/p-1
8、91641.html46.229.168.1340r愀瀀栀琀洀氀销狅絆搁/Ie前台访问/d-41981.html46.229.168.1460r倄熔挀瀀栀琀洀氀需狅絔搁响/Ke前台访问/p-153983.html207.46.13.1190r嗠跐愀瀀栀琀洀氀餀狅絗搁/Kg前台访问/p-330194.html46.229.168.1480r媐最瀀栀琀洀氀鬀狅絛搁髍/Kc前台访问/p-156543.html207.46.13.590r攜攀瀀栀琀洀氀鴀狅絯搁/前台访问/search.html?page=4&tc=393&hotKeyword=JAVA&d=-1&p=0&fileType=-1&t=&
9、u=-1&n=203.208.60.690r礈挀瀀栀琀洀氀鼀狅絽搁/Ie前台访问/p-35350.html46.229.168.1410r蓀鈣挀瀀栀琀洀氀狅炷綉搁位/Kc前台访问/p-320633.html207.46.13.590r诈淐無挀瀀栀琀洀氀狅綏搁/s前台访问/c-00001-2-9409-0-0-0-0-9-0-1.html207.46.13.1190r鋐鶚挀瀀栀琀洀氀狅綢搁/Ga前台访问/p-5209.html203.208.60.780r最瀀栀琀洀氀狅綺搁砀抰/Gc前台访问/p-5729.html202.113.13.1590r錀猀攀愀爀挀栀栀琀洀氀瀀愀洀瀀焀狅緈搁/Ic前台访
10、问/p-50761.html207.46.13.1330r紀需挀栀琀洀氀狅緐搁譍/Ia前台访问/p-14247.html54.36.150.490r攀搀栀琀洀氀狅緝搁/Ka前台访问/p-171362.html54.36.149.40r鬊攀瀀栀琀洀氀狅緭搁/Ic前台访问/p-58270.html207.46.13.1190r攀瀀栀琀洀氀狅縀搁瀭/Ie前台访问/p-45015.html46.229.168.1630r愀搀栀琀洀氀狅縉搁/Kc前台访问/p-187659.html207.46.13.590r最瀀栀琀洀氀狅梷縘搁/Ia前台访问/p-69876.html54.36.150.470r跐壢愀瀀
11、栀琀洀氀狅縱搁/Ie前台访问/p-97802.html46.229.168.1530r猀贀挀栀琀洀氀狅縼搁矍/Kc前台访问/p-147640.html54.36.149.780r廹愀瀀栀琀洀氀狅繐搁席/Kg前台访问/p-145068.html46.229.168.1440r啘淐捻最瀀栀琀洀氀狅墷繕搁讍/Ga前台访问/p-3521.html207.46.13.1330r啘跐捼攀瀀栀琀洀氀狅蒷繖搁/Ic前台访问/p-30471.html207.46.13.1330r嚄最搀栀琀洀氀狅繛搁/Ke前台访问/p-316819.html54.36.150.1440r忤饸挀瀀栀琀洀氀狅繦搁/Kc前台访问/p-
12、135429.html207.46.13.530r楄愀瀀栀琀洀氀狅繬搁/Kg前台访问/p-180127.html124.167.43.1130r灌淐挀瀀栀琀洀氀狅繲搁/Ke前台访问/p-147793.html54.36.148.2180r睔挀瀀栀琀洀氀狅繼搁/q前台访问/c-00004-6-572-0-0-0-0-9-0-1.html207.46.13.590r譀挀瀀栀琀洀氀狅舀纏搁/Ki前台访问/p-112941.html220.181.108.1490r雸挀瀀栀琀洀氀狅纞搁裍/Ga前台访问/p-3450.html207.46.13.1190r跐攀瀀栀琀洀氀狅红搁鋍/Ga前台访问/p-444
13、3.html54.36.150.1290r赝攀瀀栀琀洀氀狅纩搁/q前台访问/c-00008-5-938-0-0-0-0-1-0-1.html207.46.13.1330r攀瀀栀琀洀氀狅纱搁/Ie前台访问/p-17329.html46.229.168.154进度计划内完成;如果乙方不能按甲方总控计划完成其工作,乙方必须按甲方指令无偿追加各项投入,以达到甲方的合理工期要求为止。中建一局集团建设发展有限公司 吊顶施工分包合同47.4 非甲方原因【不可抗力除外】造成工期延误,每拖延一天罚款合同总价的 2%,并承担甲方一切相关损失。第八条 工期延误8.1 因以下任何一项原因造成乙方延误实施分包工程的,经
14、甲方项目经理书面确认,分包工程的竣工时间相应延长:8.1.1 非乙方造成工程延误,而且甲方根据总包合同已经从业主获得与分包合同相关的竣工时间的延长;8.1.2 非乙方原因造成分包工程范围内的工程变更及工程量增加超过 50 ;8.1.3 甲方未按约定时间提供开工条件、施工现场等造成的延误;8.1.4 甲方发出错误的指令或者延迟发出指令确认批准造成分包合同工期延误;8.1.5 不可抗力【有关定义见第九条】等其它非分包原因造成分包工程的延误;8.1.6 甲方认可的其它可以谅解的工程延误。8.1.7 乙方在上述任一事件发生后的 5 天内,就延误的工期以书面的形式向甲方提出报告。如果索赔事件具有持续的影
15、响,则乙方应每隔 5 天发出一份报告,事件影响结束之日起 10 天内提交最终报告给甲方商务部门。甲方在收到报告后 10 天内就报告内容予以答复或提出修改意见,否则视为已经同意。第九条 不可抗力9.1 不可抗力指业主、甲方、乙方都不可预见、不可避免、不能克服的超出一般防范能力的事件。此类事件的发生给合同一方的履约造成不可能或减弱。不可抗力包括:9.1.1 地震、洪水、海啸、飓风、台风、剧烈雷击等天灾以及恶劣气候;9.1.2 气象资料以中央气象台记录为准,不可抗力的评定标准按国家的各项规定执行。9.1.3 战争、敌对行动【无论是否宣战】;9.1.4 叛乱、暴动、军事政变、内战;9.1.5 暴乱、骚
16、乱、游行示威或混乱【乙方自身及相关联的人员内部并且是从事本工程而发生的事件除外】9.1.6 空中飞行物体坠落;9.1.7 音速或超音速飞行物或装置产生的压力波;9.1.8 国家重大庆典、国外政府首脑或国际政要到访、全国人大或政协会议、全国党代会等重大政治事件要求停工或进行各项管制而影响到工期;9.1.9 由于法律法规的变更或后续颁布的法律法规导致本合同在法律上不合法。9.2 不可抗力事件发生后,乙方应立即通知甲方,并在力所能及的条件下迅速采取措施,尽量减少损失,并根据总包合同的约定处理。不可抗力事件结束后 48 小时内乙方向甲方通报受害情况和损失情况,及预计清理和修复的费用。 不可抗事件持续发生,中建一局集团建设发展有限公司 吊顶施工分包合同5乙方应每隔 3 天向甲方报告一次受害情况。不可抗力