1、he was, the assistant was eager to serve her this time with great difficulty, he climbed into the shop window to get the dress. As soon as she saw it, the woman said s many ties.And a woman cant have too many hats, she answered.Ten minutes later we walked out of the shop together. My wife was wearin
2、g a hat that looked like a lighthouse !Lesson42 Not very musical 并非很懂音乐As we had had a long walk through one of the markets of Old Delhi, we stopped at a square to have a rest. After a time, we noticed a snake-charmer with two large baskets at the other side of the square, so we went to have a look
3、at him. As soon as he saw us, he picked up a long pipe which was covered with coins and opened one of the baskets. When he began to play a tune, we had our first glimpse of the snake. It rose out of the basket and began to follow the movements of the pipe. We were very much surprised when the snake
4、charmer suddenly began to play jazz tunes and modern pop songs. The snake, however, continued to dance slowly. It obviously could not tell某镇冯铺农村新型社区项目申请报告第一章 申报单位及项目概况第一节 项目申报单位概况一、项目申报单位及概况本项目的申报单位为某镇冯铺村村民委员会。该公司拟作为本项目的法人单位,负责某镇冯铺农村新型社区项目的开发建设工作。某镇冯家铺村位居205国道北侧,某镇以西2.5公里处,交通便利,地理位置优越。全村160户,人口596人,
5、耕地面积920亩,党员16名。近年来,冯家铺村坚持以科学发展观为指导,按照新农村建设20字方针,带领广大干部群众以发展农村经济为中心,不断调整产业结构,增加农民收入,提高农民群众的生活水平,在共同致富奔小康道路上走出了一条社会主义新农村建设的新路子。2007年,该村各项工作取得了突破性进展,实现农民人均纯收入4800元,被县委授予“五个好党支部”荣誉称号。第二节 项目概况一、项目名称某镇冯铺农村新型社区二、项目建设的背景党的十六届五中全会通过的中共中央关于制定国民经济和社会发展第十一个五年规划的建议,明确了今后5年我国经济社会发展的奋斗目标和行动纲领,提出了建设社会主义新农村的重大历史任务,为
6、做好当前和今后一个时期的“三农”工作指明了方向。 近几年,党中央、国务院以科学发展观统领经济社会发展全局,按照统筹城乡发展的要求,采取了一系列支农惠农的重大政策。各地区各部门认真落实中央部署,切实加强“三农”工作,农业和农村发展出现了积极变化,迎来了新的发展机遇。粮食连续两年较大幅度增产,农业结构调整向纵深推进,农民收入较快增长,农村税费改革取得重大成果,社会事业进一步发展,农村基层组织建设得到加强,干群关系明显改善。农业和农村发展的好形势对保持国民经济平稳较快增长和社会稳定,发挥了重要的支撑作用。但必须看到,当前农业和农村发展仍然处在艰难的爬坡阶段,农业基础设施脆弱、农村社会事业发展滞后、城
7、乡居民收入差距扩大的矛盾依然突出,解决好“三农”问题仍然是工业化、城镇化进程中重大而艰巨的历史任务。各级党委和政府必须按照党的十六届五中全会的战略部署,始终把“三农”工作放在重中之重,切实把建设社会主义新农村的各项任务落到实处,加快农村全面小康和现代化建设步伐。加强村庄规划和人居环境治理。随着生活水平提高和全面建设小康社会的推进,农民迫切要求改善农村生活环境和村容村貌。各级政府要切实加强村庄规划工作,安排资金支持编制村庄规划和开展村庄治理试点;可从各地实际出发制定村庄建设和人居环境治理的指导性目录,重点解决农民在饮水、行路、用电和燃料等方面的困难,凡符合目录的项目,可给予资金、实物等方面的引导
8、和扶持。加强宅基地规划和管理,大力节约村庄建设用地,向农民免费提供经济安全适用、节地节能节材的住宅设计图样。引导和帮助农民切实解决住宅与畜禽圈舍混杂问题,搞好农村污水、垃圾治理,改善农村环境卫生。注重村庄安全建设,防止山洪、泥石流等灾害对村庄的危害,加强农村消防工作。村庄治理要突出乡村特色、地方特色和民族特色,保护有历史文化价值的古村落和古民宅。要本着节约原则,充分立足现有基础进行房屋和设施改造,防止大拆大建,防止加重农民负担,扎实稳步地推进村庄治理。三、建设地点某县205国道以南、闫家村以北。四、建设内容与规模本项目总占地23.8亩,总建筑面积13704平方米,建设四层住宅楼6栋,共120户
9、。五、工程技术方案(一)设计依据1、中华人民共和国城市规划法;2、城市居住区规划设计规范(GB50180-93);3、某市城市规划管理办法;4、某市城市总体规划(20052020);5、编制项目申请报告的委托书。(二)规划原则1、以人为本,环境优先的原则;2、可持续发展的原则;3、科学规划、合理布局、节约土地、相对集中的原则;4、高标准一次规划、加快发展的原则。(三)规划定位项目市场定位某县新型农村社区,具有高品质居住生活环境的现代化生活社区。环境塑造定位充分利用基地特点,强调自然化生活氛围,实现天然景观要素、生态资源与人工优化处理的有机结合,使自然景观与人文景观相得益彰。建筑房型设置定位根据
10、规划设计条件,户型面积主要以107、125平方米为主。(四)规划目标基于项目用地自身特定的区位和环境资源条件,以设计现代化、园林化,创造充满时代感、富有高品质、体现某新风貌的新型农村居住空间为目标,协调住宅区内外部的环境与景观形象,合理确定住宅的布局与开发强度,建设富有特色和文化韵味的现代化、人性化、生态型城市住区。最终达到“为公众美化环境、为城市塑造形象、为开发者打造品牌、为投资者创造利润”的目标。(五)总体规划布局为了建设生态园林小区的目标要求,努力营造生态化、园林化、智能化、人文化与现代化的居住要求。规划布局秉承因地制宜、因势利导的原则,充分考虑周围的建筑、道路交通以及景观现状,将住宅合
11、理的布置于地块中,结合基地的自然形状,顺其走势形成简洁、明快、动感的构图。(六)规划设计整体框架1、规划手法强调小区建设的整体性,包括:住宅群体布局、院落组合、道路系统、绿化系统与市政基础设施,统一规划,形成整体。在整体布局的基础上,强化组团规划的相对独立性。(1)人车分流环形车行道系统,住宅组群内部的小路呈枝状挂在主路上。步行系统与景观绿化结合在一起,贯穿各个住宅院落。(2)绿化渗透围绕小区的中心绿地,有机组织每一个住宅组群的相对开放院落空间,使其与中心绿化与景观环境充分联系与融合,使中心生态景观扩展至每一个居住组群,形成整体、统一的住区生态环境。(3)空间轴线与自由布局相结合整个方案的空间
12、构图采用空间轴线控制与自由布局相结合的手法,在强调空间景观轴线的同时,在这个整体空间布局与形态上,又通过道路与建筑的有机布局来强调其自然个性,并通过步行线的组织在人行活动与视觉上将两者进行有机的结合。2、空间形态整个小区以西侧入口的轴线为空间中轴,形成整个住宅区的环境识别特征:住宅的布局围合形成向中央绿地开放的院落空间,构成一个整体。(1)公共空间优先居住活动的集约化是未来都市居住建筑的发展趋势,本方案以此为前提,将住宅、社区的生活服务设施适当的集中,在满足人们社会交往,现代生活多元需求的同时,有效控制建筑密度,让公共空间、自然生态空间与绿化环境场所成为居住社区的主题。(2)绿化渗透有机组织小
13、区相对开放的院落空间,使其绿化与景观环境充分联系与融合,使中心生态景观扩展至小区每一个角落,形成整体、统一的住区生态环境。(3)群体轮廓本项目住宅部分为四层,在景观界面的处理上注重整体性与融合性。本项目共有6栋住宅建筑,共120户,其中107平方米户型的72户,125平方米户型的48户。(4)住宅布局识别性与认同感住宅布局强调空间塑造,强调单体的布局,通过住宅单体的造型和空间限定,并结合户外绿化环境设计,形成相对内向围合的邻里空间,并且通过步行绿轴串联各个组群空间,创造空间丰富、亲近自然且具有人情味的居住环境。(5)公用建筑设施布局小区内设物业办公室、会所、诊所、配电室、锅炉房、公共厕所等。(
14、七)市政工程管线规划1、给水系统(1)用水量生活用水量:依据居住小区给水排水设计规范,确定居住生活用水量标准为120升/(日人),小区规划人口为360人。时变化系数kh=2.2,则最高日生活用水量应为95.04立方米/日。未预见用水量:规划范围内未预见用水量包括浇洒道路、绿地及管网漏失水量,按生活、公建总用水量的15%考虑,则最高日未预见用水量为14.26立方米/日。总用水量:项目建成后最高日用水量为109.3立方米/日,年用水量为3.99万立方米。(2)水源、水质供水水源由城市市政自来水管网供给,水压为0.25MPa的主管线,以确保区内给水的安全可靠。水质需符合国家生活饮用水标准。(3)消防
15、消防水量按同一时间发生火灾的次数为一次,每次消防用水量15升/秒考虑,并用消防水量与规划区最高时用水量之和校核管网。消防用水采用与生活用水管道混合供水方式。火灾发生时,最不利点满足0.1MPa充实柱。消防栓布置间距不大于120米,在主要交叉口必须设置消防栓,消防栓采用地上式消防栓。(4)管网布置给水管网接入城市管网,规划给水管线采用环状网的供水方式,以提高供水的安全可靠性。2、排水(1)排水体制本规划排水体制采用雨、污水分流制。(2)污水量污水量按最高给水量的85%计,则小区污水排放总量应为92.91m3/日,年污水排放量为3.39万m3。(3)污水管线布置小区内主管线为DN400。每栋楼前均
16、设化粪池,通过污水管有组织的汇入设在小区内部主要道路上的污水管道中,然后通过污水管道排入某县污水处理厂处理达标后排放。(4)雨水管线布置依据小区的地形特点,雨水管道充分利用地形坡度,将雨水就近排入城市干管内。3、供电系统小区内电力管线规划为VV型电力电缆穿保护管地下直埋。项目用电由当地供电公司保证供电。4、电信小区内设电话线路交接箱与本地电话网交接,小区内电话管线规划为HYA型通信电缆穿保护管地下直埋,由棣新八路接入。5、供热系统采暖符合指标:公建供热 80W/m2住宅供热 58W/m2线路敷设:拟建项目所需供热可由城市热力主干管引入小区换热站后,采用地下敷设方式向各住户、各建筑供热,供热有保
17、障。6、燃气燃气管线由城市燃气主干管引入小区调压站后,采用地下敷设方式向各住户、各建筑供气。主管线为DN150,燃气供应有保障。六、投资估算及资金筹措经估算,本项目总投资1500万元,其中自筹800万元,拟申请银行贷款700万元,项目建成后,由村民购房款偿还。七、主要技术经济指标主要技术经济指标表序号指标单位数量备注1总规划占地面积亩23.81.1项目占地面积亩23.82.建设规模2.1总建筑面积m2137042.1.1住宅建筑面积m2137042.2建筑指标2.2.1建筑平均层数层42.2.2规划总户数户1202.2.3绿化率%402.2.4容积率0.912.2.5建筑密度22.753.总投
18、资15003.1开发建设投资万元15004.资金筹措4.1项目单位自筹万元8004.2银行贷款万元700第二章 发展规划、产业政策和行业准入分析第一节 发展规划分析一、符合国民经济和社会发展总体规划的要求为深入学习实践科学发展观,认真贯彻党的十七大和十七届三中全会精神,以拉动投资、扩大内需、改善民生为主线,以加快城镇化进程、推动新农村建设、促进城乡一体化为目标,坚持政府统筹、科学规划、政策引导、市场运作,尊重农民意愿,发挥农民主体作用,实施农村新居建设工程,有序开展农村危房改造,节约集约用地,协同推进城市和小城镇建设、农村基础设施和环境建设、农村新型社区建设、农村社会保障体系建设、农村扶贫开发
19、,加快改善农村居民住房条件和生活环境,促进农村精神文明建设,促进经济平稳较快增长,促进社会和谐稳定。从2009年起,我省用3年时间实施农村新居建设工程,每年确保新建农房75万户,力争达到100万户,3年直接拉动投资3000亿元左右。冯铺农村新型社区项目是某县社会主义新农村建设项目,本项目的建设非常符合国家发展房地产业的各项政策,项目建设对加快城镇化进程、推动新农村建设、促进城乡一体化,解决农村居民住房环境问题,具有重要的意义。同时也是某县政府深入贯彻落实科学发展观,构建社会主义和谐社会,全面建设小康社会的具体体现,可有效推进本县社会主义新农村建设。二、符合某县社会经济发展和城市总体规划某县地处
20、山东省最北部,属鲁北平原,东北濒临渤海,南倚黄河。与国家重点工程黄骅大港隔河相望。西北通京(北京)、津(天津)塘(塘沽),东南连青(青岛)、烟(烟台)、威(威海),为山东半岛与京津塘的交通要塞,素有“齐燕要津”、“冀鲁枢纽”之称,距省会济南市156公里。北距北京350公里,距天津220公里,东南距青岛380公里。面积1998平方公里,人口43万。春秋属齐国某邑。西汉置阳信县。隋开皇六年(公元586年)割阳信县北部和饶安南部置某县,因境内有某沟,故名。明洪武六年(1373年),为避燕王朱棣之讳,改称海丰县。后因与广东省海丰县重名,1914年复名某县,沿用至今。曾隶属于惠民地区、某地区。2000年
21、6月起隶属于地级某市。辖6镇5乡593个行政村。某县处鲁北平原东北部,地势由西南向东北缓倾。海岸线曲折迂回,全长50多公里。主要山峰有马谷山、无影山。主要河流有马颊河、徒骇河、套儿河、德惠新河、朱龙河等。气候特点,夏热多雨,秋高气爽。某县土地资源丰富,全县土地总面积299.7万亩,人均7.1亩,其中耕地84万亩,人均2亩,两项指标均高于全省平均水平;地势平坦,土质肥沃,宜耕宜林宜牧,相继建成了粮食、棉花、冬枣、小枣、苜蓿、桑园等专业化种植基地,先后被列入全国优质棉生产基地县和全国产棉大县“百强”之列,素有“中国枣乡”和“中华金丝小枣第一县”的美誉。海域辽阔,滩涂资源开发潜力巨大,海岸线绵延10
22、2公里,浅海渔场150多万亩,浅海滩涂93万亩,是鱼虾贝类和其他海洋生物的天然“牧场”。现有盐场10处,盐田总面积300万公亩,年生产原盐200万吨。矿藏资源蕴量较大,现已探明具有相当储量的石油、天然气、贝壳砂、煤炭等。其中及其在国内外的现状,并说明研究地基与基础管理的目的 、研究方法 、研究内容及结构框架。第二章为“地基与基础施工现场常见问题”:在这章中列举了地基与基础现场勘察问题 、实测实量问题、规范施工问题、施工措施处理问题、施工方、监理、甲方对接问题五个基础现场常见施工问题点。第三章为“四大控制管理地基与基础现场”:此章阐述了地基与基础现场管理定义,并发散到如何通过进度控制、质量控制、
23、成本控制、安全控制管理现场。第四章为“地基与基础现场施工管理案例分析”:这一章将几个实习过程中的几个项目案例进行汇总分析,一共有珠海横琴某项目基坑支护及桩基工程、广州某号地块基坑支护和桩基础项目、佛山某地块四二期桩基础工程、万科某项目基坑支护及桩基工程、广州番禺珠江项目一期桩基础工程五个项目。第五章为“地基与基础现场的施工管理措施”:本章通过几个小标题讲述施工管理过程中需要重点管控的节点,依次分为:如何有效进行科学施工、安全管理必不可少、不能忽视质量小通病、重视实测测量在施工过程中的作用四个小标题。第六章为“结语”:总结地基与基础现场施工管理重点,并展望未来地基与基础现场管理的趋势所在。本章小
24、结在这一章中,显示说明了地基与基础施工的背景及意义以及其在国内外的现状,并说明研究地基与基础管理的目的 、研究方法 、研究内容及结构框架。第二章 地基与基础施工现场常见问题2.1 地基与基础现场勘察问题在地基与基础项目中,众多前期准备工作中最重要的就是地基勘察工作,在开始地基与基础设计与工程地质勘察工作之前,需要进行一些必要的准备工作,才能确保地基与基础设计与工程地质勘察工作的顺利进行。然而,在实践过程中,研究工作经常出现不一致,这主要反映在以下领域:首先,数据收集不足,其次,研究工作计划缺乏。地基研究是一项非常复杂的工作,没有通过全面、科学和理性的规划,这是工程地质勘探不严格的主要原因。2.
25、2 实测实量问题地基与基础现场施工过程中,实测实量是一项经常被忽略的工作,实测实量在地基与基础工程中,目的是为规范项目施工管理和保证项目实测实量工作顺利开展,明确实测实量的操作方法、操作流程及步骤,有助于切实落实创品牌、争效益、降成本、保质量的工程管理目标。实测实量最大的一个作用是帮助项目部对整个地基与基础工程项目能有一个全面的了解,能对项目现场出现的问题进行全方位解析。然而在国内基础建设中,实测实量并不受重视,从而导致桩偏位、承台偏位的质量事故经常发生,而实测实量管理制度则能在现场施工中出现质量事故之前及时纠偏,节约成本,增加项目效益。2.3 规范施工问题规范施工是每个地基与基础项目必须做到
26、的,但施工不规范,不合法却在国内施工现场处处可见。在地基与基础行业中,桩基础的规范施工问题值得重视,各种工艺譬如旋挖桩、静压桩、锤击桩等若没有按照操作规程进行规范施工,极易造成工伤事故发生。规范化施工是为了加强地基与基础企业工程质量管理的一个必须项,现场的管理人员若没有落实“精细管理,确保质量”的管理方针,则极易造成非必要的质量损失,比如人员伤亡、材料损耗等等。2.4 施工措施处理问题由于地基与基础工程是建筑主体项目的重要支撑,能否做好主体部分和地基息息相关,,所以施工技术措施处理在这种地下隐蔽工程中显得十分重要,否则,一旦现场出现麻烦,想要亡羊补牢则为时已晚,并且会造成十分严重的后果。因此,
27、对地基与基础工程的施工措施进行合理的科学研究非常有必要。举个例子,在地基与基础施工过程中,塌方是难以避免提及到的一项重大事故,在施工过程中,如果基坑发生坍塌,其中的地基土壤以及边坑很有可能发生沉降与扰动,这不仅仅会影响到整体地基的承载力,还会对周边的建筑房屋造成比较严重的影响,更有甚者会发生严重安全事故。特别是在基坑开挖过程中穿过不同的土层时,如果不按照不同土层的工程特性 (地基土的粘聚力、内摩擦角、重度等) 来确定地基基坑的边坡开挖坡度和支护方法,会造成严重的边坡塌方事故,后果不堪设想。基础工程开挖土方时操作不当,没有合理支护,也是造成塌方问题的主要原因之一。52.5 施工方、监理方、甲方对
28、接问题在传统施工中,施工方可直接与甲方对接资料,但在现代化施工中,监理的监控与管控显得举足轻重,积极支持现场监理人员的工作是现在地基与基础企业难以做到的一点。对甲方来说,支持监理工作要避免工程部与监理公司重复管理,这样可能会造成建设单位工作困难并且职能混乱,极易造成现场混乱的局面。本章小结本章阐述地基与基础现场施工过程中可能会出现的几个问题点并加以解释,将问题点明有利于现场施工管理的进一步发展。第三章 四大控制管理地基与基础现场3.1 地基与基础现场管理定义地基与基础现场施工管理通常指地基项目中项目部管理人员对项目上的组织管理,但其还分为几个阶段,前期准备管理、施工阶段管理以及竣工管理。在地基
29、与基础施工过程中,现场施工管理就是要做好四个方面的控制:进度控制、质量控制、安全控制和成本控制。四大控制涉及到项目从开工到竣工的方方面面,能全方位覆盖地基与基础工程施工管理,对整个工程项目提升效益及确保安全有着举足轻重的作用。 图3.1现场管理五年内在施工项目中的影响因子趋势13.2 通过进度控制管理现场在地基与基础工程中,进度控制通常体现在甲方合同要求中的工期要求当中。在工期限定的时间范围内,一般要求施工方应做好特种人员施工配置,以免有怠工情况出现。地基现场中由于客观因素影响较多,譬如天气、政府检查等多方面原因造成进度拖延的情况屡见不鲜,在这种情况下,要求项目现场管理做好施工晴雨表、月度施工
30、计划、人员班组进出场及材料进出场记录等等,这些都能简洁明了地表明该项目施工进度状况。由于进度计划的资源有限,有时候并不能实现明确的施工目标,因此存在许多控制因素和许多干扰因素。这些因素包括客观因素和主观因素。随着各种因素的变化,计划也随之变化。因此必须建造计划项目建设过程中,比较分析,计划和实际情况,需要通过有效措施,完成项目进度目标,确保目标实现。过程管理是动态的,完全控制的,三控三管一协调有时候也完全适用于质量控制。图3.2进度控制流程图3.3 通过质量控制管理现场项目质量控制指的是对工程项目的技术方向的监控。这项工作的主要部分是评估项目质量,比较项目质量标准,确定项目缺陷和问题,分析项目
31、问题的根本原因,采取措施缩小质量对比差距。它贯穿整个建设项目的质量控制管理工作。国内地基与基础行业的质量控制具体体现在甲方和监理方对施工方的监督管理上面,通过检查现场出现的已经发生或可能发生的质量问题进行调查处理,并发函联系施工方进行整改,形成一系列的收发文记录以进行质量控制。通过组织措施、经济措施、技术措施、合同措施来对现场进行整改改善,以减少质量事故发生率为主要目的进行控制。图3.3质量控制流程图3.4 通过成本控制管理现场成本管理工作是对项目成本的总的控制管理。在项目实施过程中,将项目实施的实际成本简化为项目预算内项目管理的工作。项目成本控制包括控制不同因素的三个方面,这些因素可能会改变
32、项目成本(预操作控制)、控制项目实施成本(事中控制)和控制项目成本的实际变化(事后控制)。在地基与基础项目上,成本控制意味着发现和纠正错误和错误,以确保业务运作和资产完整,并确保会计信息真实、合法和完整,以便制定和执行政策、措施和程序。在地基与基础行业中,成本控制主要集中在项目事中控制上,这和质量控制是息息相关的,规范施工,安全施工,减少质量事故的发生,这在无形之中就减少了项目工程成本的损耗。成本控制应作为降低成本、支出标准和支出范围的计划的一部分进行,以及金融纪律、监管和制度,以控制整个建筑工程的生产过程。特别是,严格的定额管理是确保成本降低的最有效的控制手段。图3.4成本控制流程图3.5
33、通过安全控制管理现场建筑安全管理是一种系统性和综合性管理,包含了建筑过程中的各种元素。因此,建筑企业必须坚持安全管理的“安全第一、预防和综合管理统一”的原则,制定安全政策、计划和安全措施,改进管理系统,检查安全生产组织,加强建筑安全。在地基与基础中,由于有大量大型机械的存在,安全管理显得尤为重要。安全控制在地基行业中主要分为现场控制以及安全意识教育两大部分。现场控制主要内容有:大型机械3米范围内设置警戒线,施工过程中严禁站人,桩基及锚索施工高处作业必须配备安全带等等;而安全意识教育则有施工班组三级安全教育以及安全意识考核两部分。安全控制目前来说是国内建筑企业最为重视的一部分,从大部分施工现场门
34、外标语可见一斑:高高兴兴上班,平平安安回家。图3.5安全控制流程图本章小结本章首先介绍地基与基础现场施工管理的定义,再通过着重叙述施工阶段中的四大控制:安全、质量、进度、成本来阐述如何科学管理现场。第四章 地基与基础现场施工管理案例分析4.1 横琴某项目基坑支护及桩基工程桩基础工程于2018年5月23日正式开始施工,珠海市质监站于2018年5月24日来项目进行质监交底,并与设计、勘察、监理、业主等单位一起25号桩进行了入中风化岩面的岩样检查,25号桩终孔时间在2018年5月25日,2018年5月27日浇筑混凝土。至2018年6月4日发现浇筑混凝土面标高错误已浇筑完成6条桩,此6条桩全部为边桩,
35、桩径为1.0米,桩长平均30米。通常空桩长度计算:空桩长度=护筒标高(仪器测出的标高是绝对标高)-设计桩顶标高(通常为绝对标高)。 本项目中设计图纸中明确:除注明外,承台顶面标高为-12.50m,2)本工程 E、竣工决算16、水利工程造价预测一般是指(ABDE )。A. 投资估算 B. 设计概算 C. 竣工决算 D. 项目管理预算17、按现行水利工程项目划分,哪几项属于枢纽工程(BC)A、堤防工程 B、水库工程 C、水电站工程 D、灌溉工程18、下列(BCD)属于现场经费中的临时设施费。A、施工供水 B、简易砂石加工系统 C、支线供水 D、小型混凝土拌和系统19、下列(ABD)属于间接费中的施
36、工企业管理费。 A、管理人员工资 B、劳动保护费 C、施工企业进退场补贴费 D、企业投标报价费用 20、下列哪几项属独立费用(BCD)。A、建设期融资利息 B、生产职工培训费C、建设单位经常费 D、建设监理费21、在其他直接费开支的项目有(AC)A、防雨保温设施 B、施工附企的照明C、高海拔地区增加费 D、施工特殊工种安全保险费22、属于建设管理费的项目有(AB)。A、建设项目管理费 B、建设监理费C、生产职工培训费 D、工程质量监督费23、按现行部颁规定,下列各项属于间接费的是(AB)。A. 企业管理费 B. 财务费用 C. 施工企业进退场费 D. 企业利润24、下列项目属于三级项目的有(B
37、CD)。A、XX段支渠 B、土工膜C、启闭机室 D、细部结构工程25、“勘测设计费应包括在各相应工程项目内”的项目有(ACD)。A、对外供电工程 B、场内永久道路 C、对外通信工程 D、管理单位房屋建筑工程26、下列项目哪些属于静态总投资(ABD)。A、基本预备费 B、独立费用C、融资利息 D、设备费99第二章 工程建设定额一、选择题1、技术工人在一定施工组织条件下,在单位时间内应当完成合格产品的数量或完成单位合格产品所需的劳动时间称为(B)。A、材料定额 B、劳动定额 C、综合定额2、每个时期的定额都代表着这一期间的施工技术和施工管理水平,在时间上是相对稳定的,这体现了定额的(D)。A、科学
38、性 B、系统性 C、针对性 D、时效性和稳定性3、现行建筑概算定额的零星材料费是以费率()形式表示,其计量基数为(C)。A、主要材料费之和 B、人工费加主要材料费之和C、人工费、机械费之和 D、机械费4、凡定额子目以建筑物尺寸或运输距离划分的,当选用的定额介于两子目之间时,可用(D)调整其定额消耗量。A、取大法 B、近似法 C、平均法 D、插入法5、某水库导流洞设计开挖直径为2m,洞长100m,规范允许超挖10cm,初步设计阶段工程量扩大系数为1.03,用现行部颁水利建筑工程概算定额编制概算的洞挖石方工程量为(A)A、324 B、314 C、392 D、3926、某引水洞设计混凝土衬砌后洞径为
39、2m,设计混凝土衬砌厚度为30cm,洞长100m.洞挖石方时平均超挖10cm(属规范允许范围内),初步设计阶段工程量扩大系数为1.03,则采用现行部颁建筑概算定额编制概算混凝土衬砌的工程量为(C)。A、217 B、302 C、223 D、3117、某导流洞设计开挖直径为2m,洞长100m,超挖10cm(属规范允许范围),则采用现行部颁建筑预算定额编制施工图预算的洞挖石方工程量为(B)。A、392 B、380 C、346 D、3148工程建设前期阶段造价文件编制所使用的定额,其原则宜( A )。A、反映社会平均水平B、反映企业平均先进水平C、反映国家经济发展水平D、反映先进企业所达到的水平9如采用概算定额编制投资估算时,应乘投资估算调整系数,其数值为( C )。A1.03 B1.05C1.10D. 1.1510编制概算采用的工程量应是( C )。A图纸工程量加施工损耗量B图纸工程量加施工附加量C图纸工程量乘以设计阶段系数D图