收藏 分享(赏)

IHG洲际酒店酒店员工宿舍标准.pdf

上传人:空登山 文档编号:6566735 上传时间:2022-08-08 格式:PDF 页数:7 大小:437.52KB
下载 相关 举报
IHG洲际酒店酒店员工宿舍标准.pdf_第1页
第1页 / 共7页
IHG洲际酒店酒店员工宿舍标准.pdf_第2页
第2页 / 共7页
IHG洲际酒店酒店员工宿舍标准.pdf_第3页
第3页 / 共7页
IHG洲际酒店酒店员工宿舍标准.pdf_第4页
第4页 / 共7页
IHG洲际酒店酒店员工宿舍标准.pdf_第5页
第5页 / 共7页
亲,该文档总共7页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Design Guidelines for Staff Dormitory (Oct o6)/ SSy 1 Staff Dormitory ? With the increasing number of hotels opening each year, the demand for staffs both experienced or new recruits are increasing. For areas and regions such as Chinas secondary and tertiary cities where the recruitment of qualified

2、 local staffs are limited, thus there is a demand for staffs from overseas or from neighboring provinces. Staff dormitory are provided as accommodation for these people. The dormitory may be an independent building built separate from the hotel or a part of the hotel delegated exclusive for full-tim

3、e staff accommodation. Staff count is based on regional requirement and may vary from region to region. ? !#?$?%&?()*?+?,-?.?/02134?56798?:?AB?C5?DA?B?C-FEHGIJ?K6?+?ML?NOP?Q?RS?T$UVW?XYZC?-0?1?%?_ab?cd?e02?fhgH%?ij?kFlmn?$op?q?r34_s?bc?d?e09(?tuvw6?xy?z+67!?+?0 Facilities |?|?|?|?Facilities provided

4、 are: cd! TV Lounge and Rest Area ? Equipped with Air-conditioning and Heating System ? Design Guidelines for Staff Dormitory (Oct o6)/ SSy 2 1) Sleeping Quarters and Toilet-Shower Facilities ? - For Line Staff ? ? 4 to 6 bunker beds per sleeping quarters ?46- ? 1.00m wide x 2.00m length double deck

5、 bunker bed ?1.00 x 2.00 ? Wardrobe size of 0.60m wide x 0.60m depth x 1.80 or 2.00m high with built-in drawers -0.6 x 0.6 x 1.8-2? ? Optional bedside table and mirror ?-?- ? Shared study and writing table with electrical and data port for internet connection -?-?9- ? The sleeping quarters floor fin

6、ishes and skirting shall be of heavy duty ceramic or homogeneous tiles, linoleum or vinyl flooring. ?-?-h?h? ? The sleeping quarters wall and ceiling finishes shall be painted finish to finished concrete. ?-?-? ? Air conditioning and Heating system to be provided ? ? Solid timber doors ? The corrido

7、rs floor finishes and skirting shall be of heavy duty ceramic or homogeneous tiles, linoleum or vinyl flooring. ?-?-?h?-?-? ? The corridor wall and ceiling finishes shall be painted finish to finished concrete. ?-?-?-? ? Communal toilet and shower facilities with hot and cold water supplies ? ?! ? T

8、oilet and shower cubicles shall be provided with doors and individual clothes hook. #$%#?&?(*)-?+ ? Vanity counter with mirror and hair dryers as well as a separate full length mirror shall be provided. ,?-?-?./?0?(?123 ? The floor and wall finishes to toilet shall be of non-slip ceramic or homogene

9、ous tiles. Wall tiling shall be up to ceiling height #-?-?-4-? ? The ceiling finishes to toilet shall be painted with water-resistant paint to finished concrete or to water-resistant ceiling board #-?-?-?5 -?6 ? ? Air conditioning and Heating system to be provided ? Design Guidelines for Staff Dormi

10、tory (Oct o6)/ SSy 3 Bunker Bed 7859 Bunker Bed with shared study/writing/ computer table 7859;:=?BACD6E?CGFIH - For Senior Staff (Band 4, 5 &6) J5K?ML4N5O6K=P ? Individual room or 2 staffs to one sleeping quarter with wall separator (?1Q=#2?R?S?T-h?UV?W ? 1.20m wide x 2.00m length bed h?1.20 x2.00

11、? Wardrobe size of 1.00m (minimum) wide x 0.60m depth x 1.80 or 2.00m high with built-in drawers. -X1.00 x 0.6 x 1.8-2 ? Attached toilet and shower facilities per room Q#? ? Bedside table and clock ?-%YZ ? Study or writing table with electrical and data port for internet connection ?9- ? Sofa chair

12、and coffee table ?_? ? TV set, telephone facilities, coffee and tea making facilities, ba0&c?d?_?50-e ?0 ? Full length mirror 23 Design Guidelines for Staff Dormitory (Oct o6)/ SSy 4 ? The sleeping quarters floor finishes and skirting shall be heavy duty ceramic or homogeneous tiles. ?-?-h? ? The sl

13、eeping quarters wall and ceiling finishes shall be painted finish. ?-?-? ? Air conditioning and Heating system to be provided ? ? Solid timber doors ? Private toilet and shower facilities per room Q=#f?g? ? Vanity counter with mirror and hair dryers as well as a separate full length mirror shall be

14、provided. ,?-?-?./?0?(?123 ? The floor and wall finishes to toilet shall be of non-slip ceramic or homogeneous tiles. Wall tiling shall be up to ceiling height #-?-?-4-? ? The ceiling finishes to toilet shall be painted with water-resistant paint. #-?-6 ? ? Air conditioning and Heating system to be

15、provided ? Hotel Cafeteria hbi?jklnm Communal Self-Cooking Pantry and Dining Area o:?prq*s%t&u;vwl9 Design Guidelines for Staff Dormitory (Oct o6)/ SSy 5 - For Executive Staff (Band1, 2 & 3) x6y?zL1N2O3KP ? Individual room with wardrobe and attached toilet-shower facilities (?1Q=#? ? Bedside table a

16、nd clock ?-%YZ ? Study or writing table with electrical and data port for internet connection ?- ? Provided with living hall furniture and dining table set |F? ? Sofa chair and coffee table ?_? ? TV set, telephone facilities, coffee and tea making facilities, ba0&c?d?_?50-e ?0 ? Full length mirror 2

17、3 ? The sleeping quarters floor finishes and skirting are carpet or timber flooring with timber skirting same finishing as hotel guestrooms. ?%?-?Q?%? ? The sleeping quarters wall and ceiling finishes are wallpaper finish to wall and painted ceiling finish same finishing as hotel guestroom ?U?4?-?Q-

18、%- ? Air conditioning and Heating system to be provided ? ? Solid timber doors 2) Recreational Facilities for Senior and Line Staff ?I?;?I?;?I?;?I?;? ? TV lounge and rest area, baw? ? Ping-pong table (optional), ?-? Public telephone booth, &c? ? Internet stations, ? ? Library and Reading area 5 ? No

19、tice board and art works ?w ? The floor finishes and skirting shall be of heavy duty ceramic or homogeneous tiles -?-?-?h-? ? The wall and ceiling finishes shall be painted finish. -?-?-? Design Guidelines for Staff Dormitory (Oct o6)/ SSy 6 ? Solid timber door or glass door ? ? Air-conditioning and

20、 heating system ? 3) Pantry and Dining Area &?5&?5&?5&?5 ? Shared hotel cafeteria facilities, or communal self-cook pantry and dining area ?R?S?dr?w# ? For communal self-cook pantry and dining area, the floor and wall finishes shall be of non-slip heavy duty ceramic or homogeneous tiles. Wall tiling

21、 shall be up to ceiling height. Ceiling finishes shall be painted finish. Pantry shall be equipped with kitchen cabinets, cooker and hob and complete with crockery and cutlery, dining tables and benches. B?=#-?hh?-4?F-?-?d#?h?95-h* ? With the exception of senior executive staff like General Manager

22、and GM-designate, private kitchen facilities are provided complete with appropriate crockery and cutlery and other cooking and dining utensils. For Executive Committed, kitchen facilities are optional. ?RSh&?-?f?g?Q?d?5?gR?Q?- 4) Laundry Facilities ?5?5?5?5 ? Shared hotel laundry facilities or communal washer and dryer (the latter is optional) ?0-?0?-% Standard Room Layouts ? Design Guidelines for Staff Dormitory (Oct o6)/ SSy 7

展开阅读全文
相关资源
相关搜索
资源标签

当前位置:首页 > 经管营销 > 企业管理

本站链接:文库   一言   我酷   合作


客服QQ:2549714901微博号:文库网官方知乎号:文库网

经营许可证编号: 粤ICP备2021046453号世界地图

文库网官网©版权所有2025营业执照举报